Dholera SIR · Residential plotting

AeroVista

Wide 40-metre approach road, airport-corridor positioning, and a layout built for long-term liveability — backed by Palacio Estate’s guided buying process.

Download project brochure (PDF)

Project overview

Planned community, practical connectivity

AeroVista sits in Dholera’s growth story with a clear road hierarchy and sensible plot sizing — ideal for families building a home and investors who value location + documentation discipline.

  • Frontage on a 40m arterial for access and future visibility
  • Alignment with Dholera SIR and regional infrastructure roll-out
  • Support on title checks, NA/NOC context, and site visits
Residential plots and roads at AeroVista development
40m Approach road
SIR Dholera region
Corridor Airport-side access
Project brochure PDF · Highlights, location context & next steps — save or share offline.
Download PDF

At a glance

Key highlights

What buyers notice first — infrastructure intent, security of context, and everyday convenience.

40m road frontage

Strong approach width supports smoother traffic flow and a premium entry experience.

Airport-side story

Positioned for the international airport and freight narratives shaping Dholera’s next decade.

Planned community

Structured layout thinking — not ad-hoc parcels — with clear zoning intent.

Street lighting

Roads planned with lighting in mind for safety and evening usability.

Water planning

Utility corridors considered upfront — critical for long-term residential use.

Green buffers

Open and landscaped zones to balance built form with breathing room.

Connectivity

Location advantages

Dholera isn’t only local demand — it’s corridor logic, policy visibility, and multi-city reach.

Aviation catalyst

Airport-phase momentum improves business and cargo access — a demand driver over time.

DMIC spine

Western industrial and freight corridors link Dholera into national logistics flows.

Ahmedabad reach

Metro-region proximity for services, travel, and professional mobility.

Master-planned SIR

Named region status vs unnotified peri-urban belts — easier to track phases and intent.

Map overview of the Delhi–Mumbai Industrial Corridor region
Corridor context — verify latest routes and milestones with official notifications.

Layout

Plot layout

Illustrative master layout — final dimensions and numbers are confirmed at booking with site drawings.

AeroVista project master layout plan showing roads and plot divisions

How to read this: road hierarchy, plot clusters, and open zones are shown for discussion — your Palacio Estate advisor walks you through facing, width, and documentation on a site visit.

Schedule layout walkthrough

Lifestyle & infrastructure

Amenities

Planned provisions that support everyday living as the community matures.

Internal paved roads
Power infrastructure
Water supply planning
Street lighting
Drainage approach
Landscaped buffers
Plot demarcation
Community security intent
Open & play-friendly zones

Investment lens

Investment benefits

Structural reasons investors shortlist Dholera belts — not investment advice; always do your own due diligence.

Long-cycle growth

Greenfield regions can compound value as infrastructure and population catch up — with liquidity and timing risk.

Clearer paperwork path

Reputable projects emphasize NA, NOC, and title hygiene — we help you ask the right questions.

End-user + investor mix

Plot products appeal to home builders and long-hold investors — depth matters for resale narratives.

Site-led decisions

We encourage site visits so you judge road width, frontage, and neighbourhood context firsthand.

Book a site visit to AeroVista

Walk the approach road, review the layout, and get answers on documentation — then decide with confidence.